List of Major Works completed in the last 5 years(Scroll sideways to view full table) |
||||||
| S.No. | Name of the Project | Name of the Client | Type of Project | Start Date | Finish Date | |
| 1 | Supply, Erection, Testing, Commissioning, LT Emergency PDB along with LT Cables, Trays and Earthing | Zirconium Complex, (A Unit of NFC) Pazhayakayal, Tuticorin |
Industry | Mar-2025 | Feb-2026 | |
| 1 | Supply, Erection, Testing, Commissioning, LT Emergency PDB along with LT Cables, Trays and Earthing | Zirconium Complex, (A Unit of NFC) Pazhayakayal, Tuticorin | Industry | Mar-2025 | Feb-2026 | |
| 2 | Electrical & DG works | Olympia 22C IT Park, Thiruvika Industrial Estate, Guindy, Chennai | IT Park | Sep-2024 | Feb-2026 | |
| 3 | Electrical Renovation works | Ms. Anjana Iyer, Bishops Garden Greenways Road, R.A. Puram, Chennai | Residence | Jun-2025 | Sep-2025 | |
| 4 | HT, LT & ELV Electrical works | Nagerkovil Arya Bhavan, Melmaruvathur | Hotel | Mar-2025 | July-2025 | |
| 5 | Supply, Installation, Testing & Commissioning of Electrical and ELV Works | Dr Govindans Hospital, Convent Road, Trivandrum - Phases 1 & 2 | Hospital - Phase-1 | Aug-2020 | Mar-2022 | |
| Phase-2 | Aug-2023 | May-2025 | ||||
| 6 | SITC of 1000 KVA Transformer / LT Panels / Cables and allied Electrical works |
XMOLD Polymers Pvt. Ltd. (Unit II), F - 27 /89, SIPCOT INDUSTRIAL COMPLEX, Gummidipoondi, Chennai |
Factory | Jul-2024 | Jan-2025 | |
| 7 | Electrical works | Giraffe Outlet in Rajiv Gandhi International Airport, Hyderabad under FL Traders Pvt. Ltd., Chennai | Restaurant | May-2024 | Jul-2024 | |
| 8 | Electrical & ELV Works | "TCH Retirement Home Private Limited" - Illam Senior Citizens Residence at Kadambadi, ECR, Chennai | Residential Apartments | Aug-2022 | Jan-2024 | |
| 9 | Electrical HT & LT works | M/s. Lotus Ventures, Bangalore under Divinus Prime Projects India Pvt Ltd. | Industry - IT/ITES/Retail/Hospitality | May-2022 | June 2024 | |
| 10.0 | Electrical & IT works | 8 Outlets (Restaurants) in KIAL, Terminal-2, Bengaluru under FL Traders Pvt. Ltd., Chennai | Restaurant | Aug-2022 | Jan-2024 | |
| 11 | Augmentation of Substation capacity by providing additional 630 KVA transformers and allied Substation equipments at AG(A&E) office, Teynampet, Chennai | CPWD, Thirumangalam | Office | Apr-2022 | Dec-2022 | |
| 12 | Charges for Supply, Installtion, Testing & Commissioning of Electrical & Diesel Generaror Package Works | M/s Olympia Amazon, Thirumazhisai | Warehouse | Dec-2020 | Sep-2021 | |
| 13 | Renovation in Electrical Installations | Christian Mission Chariatable Trust, Chetpet, Chennai | Non Profit Organization | Oct-2020 | Dec-2021 | |
| 14 | Charges for Supply, Installtion, Testing & Commissioning of Electrical & Diesel Generaror Package Works | M/s T1 & T2 Olympia Opaline Residential Apartments, Navalur, Chennai | Apartments | Apr-2020 | Dec-2022 | |
| 15 | Electrical works pertaining to Supply, Installation, Testing, Commissioning of Power Distribution Board, LT Cabling & Terminations, 7m Octagonal Street Light Pole, 12.5m High Mast, UPS with Battery, Light fittings, Fans, Exhaust fans, Switches & Sockets, Earthing, Lightning Protection system, Cable Trays, Hume pipes including Telephone & Network cables, HDPE pipes and allied works at Atomic Energy Central School at Zirconium Complex, Pazhayakayal, Tuticorin, Tamilnadu | Nuclear Fuel Complex, Department of Atomic Energy, Hyderabad |
Educational Institution | Apr-2020 | Dec-2021 | |
| 16 | Electrical works – Supply, Installation, Testing & Commissioning of Electrical Works (Panels and Low Side Works) including LT Panels, MCB Distribution Boards, Isolators, LT Cables and Terminations, Cable Trays, Lightning Protection , Earthing, and allied works. | M/s Saravana (Tex) Gold Showroom, Purasaiwalkam, Chennai |
Showroom | Oct-2019 | Mar-2020 | |
| 17 | Supply and Installation of Ring Main Gear, 11 KV HT Panel, 1600 KVA Cast Resin Dry Type Transformer with OLTC & RTCC, 2500 A Bus Duct, 800 Amps, 630 Amps & 400 Amps Rising Main, Main LT Panel with 500 KVAR APFC Panel, Medical Equipment Panels, UPS Panels, Chiller Panel & Sub Panels, DBs’, Cables, Wires, Switches & Sockets, Earthing, External Lighting, 6M Street light Poles, Lightning Protection system & Installation of 2 x 625 KVA DG sets with exhaust piping, 275 KVA UPS, 500 KVA UPS, 30 KVA UPS and obtaining CEIG & TNEB approvals. ELV works including Nurse call system, TV system & Cable trays for ELV network cables | M/s Prashanth Fertility Research Centre Pvt. Ltd., Kolathur, Chennai | Hospital | Sep-2019 | Mar-2022 | |
| 18 | Electrification including Lower side communication networks such as telephone, CCTV, camera etc. | Bungalow of Mr. Udayarkar, Injambakkam, Chennai | Residence | Sep-2019 | Dec-2021 | |
| 19 | Electrical works pertaining to Design, Supply, Installation, Testing and Commissioning of 2500 KVA, 11KV / 415V Oil type Transformer, 4000A Copper Bus duct, PCCA /MCCA /EMCC-A Panel, 750KVA DG set with Exhaust, LT Cables & Terminations, Cable trays, Earthing and allied works & Installation, Testing and Commissioning of HT Panels, HT Cables & Terminations, EPCC Panel & allied works. for MRTDDF project at Zirconium Complex, (A Unit of NFC) Pazhayakayal, Tuticorin (Tamilnadu) | Dept of Atomic Energy, Heavy Water Board | Industry | Aug-2019 | Aug-2022 | |
| 20 | Electrical and Diesel Generator System Package Works SH: Providing HT & LT Cables and Terminations, Distribution Boards, Cable Trays, ,Switches & Sockets, Earthing, Lightning Protection system and allied works including Installation of 2000 KVA Transformer, HT Panels,2x1010 KVA DG set along with DGs’ exhaust piping, 3200 A & 2000 A Bus Ducts, 1600 A Rising Mains. | Olympia Inspire IT Park, Guindy, Chennai | IT Park | Mar-2019 | Apr-2021 | |
| 21 | Electrical works at Third Floor – including LT Panels, MCB Distribution Boards, Internal & External Wiring for lights / fans & other Equipment, Isolators, LT Cables and Terminations, Cable Trays, Switches & Sockets, Lightning & Protection, Earthing, and allied works | Madras House Hotel AT VR Chennai, Chennai under Sugam Vanijya Holdings Pvt Ltd | Hotel | Jan-2019 | Aug-2019 | |
| 22 | Electrical works at Terrace - including outdoor LT Panel, Rising Main Tap off boxes, MCB Distribution Boards, LT Cables and Terminations, Cable Trays, Switches & Sockets, Earthing, and allied works. Erection of Outdoor light fixtures including Planter lights, Bollards, Swimming Pool lighting, Outdoor Event deck lighting, Tennis Court, Outdoor Bar area etc. | Feb-2019 | Aug-2019 | |||
| 23 | Electrical Works - Providing IEI & fans i/c Service connection, solar water heaters, Lifts, Lightning conductors and Down comer system including LT Panels, MCB Distribution Boards, Bus Bar Trunking, Isolators, LT Cables and Terminations, Cable Trays, Cable Management Systems, Fire Alarm ,Switches & Sockets, Earthing, and allied works. |
IIT Palakkad (Under CPWD, Calicut) | Hostel | Apr-2017 | Mar-2019 | |
| 24 | Electrical works – Execution of Electrical works for External Services for Tower, Heritage, Deluxe block & Common areas and Execution of Low side Electrical Works for Renovation of Heritage Block (80 & 90 series), Tower Block, Corridors at Vivanta by Taj Connemara – Chennai, including 2 Nos. of 750 KVA Transformers, HT Panel, LT Panels, Rising Main, Bus Ducts, MCB Distribution Boards, Isolators, LT Cables and Terminations, Cable Trays, Switches & Sockets, Lightning & Protection, Earthing, and allied works | Taj Vivanta (Connemara Hotel), Chennai | Hotel | Nov-2016 | Feb-2019 | |
| Oct-2017 | Feb-2019 | |||||
| 25 | Electrical works - Wiring / Cables / Distribution Boards / Cable Tray / Earthing / Light Fittings / Lightning Arrestor and allied works | EI & Fans in New Government Medical College at General Hospital Compound, Thiruvananthapuram (Block I) | Medical College | Jul-2015 | Jan-2017 | |
| 26 | Electrical works - Wiring / Cables / Distribution Boards / Cable Tray / Earthing / Light Fittings / Lightning Arrestor and allied works | The Park Residence, kotturpuram, Chennai | Residence | Apr-2015 | Mar-2019 | |
| 27 | Electrical works - HT & LT Panels / DBs / Cables / Switches & Sockets / Data & Voice / External Lighting / Lightning Protection System / UPS System / Fire Alarm System / CCTV System / PA System/ EPABX System / DG Set and Allied works | M/s. Prashanth Hospitals, Velacherry ( Phases 1 & 2) | Hospital - Phase-1 | Jul-2012 | Sep-2013 | |
| Phase-2 | Sep-2014 | Apr-2017 | ||||
| 28 | Electrical works / Panels and Panel Modification works Panels / distribution Boards / Cables / Cable Trays, Raceways Lightning protection System Rising Mains | Apollo Womens Hospitals, Shafi Mohammed Road, Chennai | Hospitals | Jun-2014 | Apr-2015 | |
| 29 | Electrical works - SITC of 2 x 500KVA of Substation Equipment for Substation No. III | IIITD&M, Melakkottaiyur, Kancheepuram District.- | Educational Institution | Jan-2014 | Oct-2014 | |
| 30 | Electrical Works - Motion sensors at V to IX Floors | M/s. RBS Business Services Pvt. Ltd, Olympia Tech Park, Guindy | Bank | Sep-2013 | Jan-2014 | |
| 31 | Electrical works - Panels / DBs / Cables / Switches & Sockets / Data & Voice / UPS System / DG Set and other allied works | Mr. Ajit Chhordia's Residence, Chennai | Residence | Aug-2013 | Aug-2015 | |
| 32 | Internal Electrical Installations and fans, Data Cabling, Day light & Occupancy sensors etc at Lecture Hall |
IIITD&M, Melakkottaiyur, Kancheepuram District.- | Educational Institution | Aug-2013 | Oct-2014 | |
| 33 | Electrical Works - Transformer, VCB Panels, LT Panels, HT & LT Cables and Cable Termination, Rising Main, Distribution Boards, Isolator, Earthing, Cable Tray, Wiring, Safety Equipments, Telephone / Data, Inverter, Lightning Protection System, Light Fixtures & DG System with Sync Panel and Accessories and allied works | M/s. Olympia Tech Park - Platina | IT Park | Jun-2013 | Nov-2014 | |
| 34 | Electrical works - Panels / DBs / Cables / Switches & Sockets / Data & Voice / External Lighting / Lightning Protection System / Raceways / UPS System and allied works | M/s. IBIS Hotels, Chennai | Hotel | Jan-2013 | Oct-2014 | |
| 35 | Electrical works – Panels, DBs, Street Light Poles, Earthing, cables and terminations, Inverter, Light fittings etc. |
Beach House, ECR, Chennai |
Residence |
Dec-2012 | Oct-2013 | |
| 36 | Electrical works - Panels, Cablwes, DBs, Cables, Terminations, Earthing. Light fittings, wiring, and other allied works | M/s. Caladium properties Pvt. Ltd., | Residence | Dec-2012 | Apr-2015 | |
| 37 | Electrical External Infra Strcture work : Panels / RMG / 200 KVA Transformer / Distribution Boards / Earthing / Cables / Terminations / Light Fixtures / Lightning Protection System / Allied works | The Orchids, M/s. Rakindo Township Pvt. Ltd., Phase 1, Madhukkarai, Coimbatore | Residential Apartments | Apr-2012 | Apr-2013 | |
| 38 | Interior Fitout works: Panels, Distribution Boards, Light Fittings, Cables, Earthing, Cable Trays etc. |
M/s. Qualcomm,TVH Agnitio IT Park | IT Park | Apr-2012 | Aug-2012 | |
| 39 | Electrical works – Panels, DBs, Street Light Poles, Earthing, Light Fittings, cables, terminations etc. | ECR Farm House, Chennai |
Residence |
Jun-2011 | Jul-2012 | |
| 40 | Electrical works - Panels, UPS, Distribution Boards, Cables and wiring, Earthing, Light Fixtures and Cable Trays, Distribution Boards, Cables, Static Transfer Switch etc., | The World Bank, Taramani, Chennai | Bank | Nov-2009 | Nov-2011 | |
| 41 | Interior Fitout works: Panels, Distribution Boards, Light Fittings, Cables, Earthing, Networkings Fire Alarm Systems, etc. |
M/s. Areva Bio-Energy India Pvt. Ltd., Maraimalai Nagar, Kancheepuram |
Industry | Nov-2010 | Mar-2011 | |
| 42 | Electrification for Industry - 1x630KVA Transformer, 1* 365 DG Set Allied HT Panels,LT Panels & Bus Ducts, Cabling & Termination, Lighting Protection |
M/s. MOC Dies & Moulds, Chennai | Industry | Sep-2010 | Aug-2011 | |
| 43 | 5 Star Hotel with 171 Guest Rooms, Lobby, Restaurants, Kitchen etc. 1 x 630KVA Transformer, Rising Mains, Cabling, Cable Trays, Earthing, DG Set , TV System, Net working system, Lightning Protection System, Wiring and allied works |
M/s. Aloft Hotels, Coimbatore |
Hotel | Jun-2010 | Aug-2011 | |
| 44 | Panels, UPS, Distribution Boards, Cables and wiring, Earthing, Light Fixtures and Cable Trays | Bharti Airtel Ltd., First Floor, Siruseri | Telecom - Data Centre - Interior fitouts | Oct-2009 | Nov-2009 | |
| 45 | Panels,UPS, DBs,Cables & wiring, Earthing,Light Fixtures, Cable Trays | M/s. Bharti Airtel Ltd., Santhome, Chennai | Data Centre -Interior fitout | Oct-2009 | Nov-2009 | |
| 46 | 3 Star Hotel with 134 Guest Rooms, Lobby,Restaurants,Kitchen,1x1000KVA Transformer,2 x 365 KVA DG Sets,Rising Main,Busducts,Cabling, Cable Trays, Earthing, Wiring works | M/s. Aloft Hotels, Sholinganallur | 3 Star Hotels - Infrastructure & Interior fitouts | Jun-2009 | May-2010 | |
| 47 | Electrical Installation including HV/LV electrical equipments like Panels, DBs, Transformers, DG Sets, Fire Alarm System, Public Address System | M/s. Prashanth Multi Speciality Hospitals, Harrington Road, Chetpet, Chennai | Hospital | Nov-2008 | May-2010 | |
| 48 | Panels, Transformers, Distribution Boards, Light Fittings, Cables and earthing etc. | M/s. ABN AMRO N.V. at KRM Towers, Chetpet, Chennai | IT - Interior fitouts | Nov-2008 | Mar-2009 | |
| 49 | HV/MV installation including transformers, generators, LT switch boards, cabling, earthing etc | Fairmont Hotel, Electronic City, Bangalore | 5 Star Hotels - Infrastructure & Interior fitouts | Apr-2008 | Dec-2008 | |
| 50 | MV Switchgears, DBs, Fire Alarm system, Computer Data Cabling & HVAC Works etc | Trident Hilton, Health Club, Chennai | 5 Star Hotels - Infrastructure & Interior fitouts | Jan-2008 | Jun-2008 | |
| 51 | HT/LT//LV installation for office cum factory premises inclusive of 2x500 KVA Transformer,1 x 500 KVA DG. All LV installation including access control, CCTV, Fire Alarm, PA System, Voice and Networking system | Diab Core Materials India P Ltd., Sriperumpudur. (90000 Sq.ft.) | Industrial - Infrastructure & Interior fitouts | Oct-2007 | Jul-2008 | |
| 52 | 3x 1600KVA Trfrs., 3 x1500KVA DG sets, LT Panels, HT/LT Cables, sandwich type Rising Mains and Bus Ducts, Cable trays, Earthing (Ph I) | TCG Developments India Pvt. Ltd. 108, Chennai 600 116 | IT - Infrastructure | Sep-2007 | Jun-2008 | |
| 53 | Data Centre Building at Siruseri, Infrastructure electrical works including 2 x 1250KVA + 4 X 1600KVA Transformer, 2 X 1100 KVA + 4 X 2000 KVA DG Sets, HT/LT Cables, sandwich type Rising Mains & Bus Ducts,Cable trays,Earthing etc | Bharti Airtel Limited 101, Santhome High Road, Chennai 600 028 | Telecom - Data Centre - Infrastructure | Aug-2007 | Dec-2008 | |
| 54 | Raceways – Electrical. & Data including LT Panels, Auto Change over Panels,DBs,Wiring for Lighting, Raw Power & UPS,Cable Trays,Cable Ducts (Net working),Cabling,Earthing, Light Fittings, Switch & sockets for IT Office cum Server,Hub Rooms. UPS Systems: 4 X 60 KVA + 4 X 80 KVA | E-bay (M/s. Paypal India Pvt. Ltd.), Rama Rao Road, (Behind Nageswara Park) Mylapore, Chennai – 4 (1,50,000 q.ft.) | IT - Raceways | Aug-2007 | May-2008 | |
| 55 | Five Star Hotel – Thanjavur Restaurant including Lighting, Dimmers, Power, UPS, Telephone, Networking, Fire Alarm | Trident Hilton 1/24,Meenambakkam, Chennai | 5 Star Hotels - Infrastructure & Interior fitouts | Jul-2007 | Oct-2007 | |
| 56 | 630 KVA Unitised Substation, 2 x 500 KVA DG Sets, 100 KVA UPS, LT Power and Lighting etc | Konica Laboratory Nungambakkam Chennai | Photo Lab cum Show Room | Jun-2007 | Nov-2008 | |
| 57 | 630 KVA Unitised Substation, 2 x 500 KVA DG Sets, 100 KVA UPS, LT Power and Lighting and associated works with specialized systems for MRI, CT Scans | M/s. Lister Laboratories Chennai | Medical Laboratory | Jan-2007 | Sep-2007 | |
| 58 | Additional Class Rooms including wiring for lighting, power and UPS, DBs for class rooms. Distribution arrangements for incorporating an additional DG set (380 KVA) & for a 100 TR chiller | American International School, Taramani, Chennai (30,000 Sq.Ft.) | International School - Interior fitouts | Aug-2006 | Dec-2006 | |
| 59 | Floor raceways (5 Floors) & (3 Floors) including LT Power and Lighting DB, Auto Change over Panels, Rising Mains . Wiring for Lighting, Raw Power & UPS, Cable Trays, Cable Ducts (Net working), Cabling, Earthing, Light Fittings, Switch & sockets, PA Systems and associated works Etc. UPS Systems: 2 X 120 KVA + 4 X 60 KVA | ABN Amro Central Enterprises Pvt. Ltd., Olympia Tech Park, Chennai (105,000 Sq.Ft.) | IT- Interior fitouts | Jun-2006 | Mar-2007 | |
| 60 | 3 x 2500KVA transformers, 4 X 1500KVA DG sets, HT/LT Cables, sandwich type Rising mains and bus ducts, Cable trays, Earthing and allied electrical works (Phase II) | Khivraj Tech Park Pvt. Ltd., Chennai (6,50,000 Sq.Ft.) | IT - Infrastructure | May-2006 | Mar-2007 | |
| 61 | Floor raceways (3 Floors) Internal electrical works ( 3 Floors) including LT Power and Lighting DB, Auto Change over Panels, Rising Mains . Wiring for Lighting, Raw Power & UPS, Cable Trays, Cable Ducts (Net working), Cabling, Earthing, Light Fittings, Switch & sockets, PA Systems etc. UPS Systems: 2 X 300 KVA + 1 x 200 KVA | Hewlett Packard Global Soft Ltd. Olympia Tech Park, Ekkaduthangal, Chennai 1.20.000 Sq.ft | IT - Interior fitouts | Apr-2006 | Sep-2006 | |
| 62 | IT Office space including 1 X 800 KVA Transformer, 2 X 500 KVA DG sets, Main LT Panel, Bus Ducts, LT Panels, wiring for lighting, raw power, UPS. Raceways,cable trays, cabling, earthing, switchboards,DBs | M/s. Honeywell Technology Solutions Lab Pvt. Ltd. Madurai (1,20,000Sq.ft.) | IT - Infrastructure and Interior fitouts | Jan-2006 | Oct-2006 | |
| 63 | 2x2000KVA Transformers, 5x1010 KVA DG sets, HT/LT Cables, Air insulated type Rising Mains and Bus Ducts, Cable trays, Earthing etc | GMR Varalakshmi Tech Park OMR Chennai (2,40,000 Sq. ft.) | IT - Infrastructure | Dec-2005 | Mar-2007 | |
| 64 | Supply and erection of floor raceways. | Verizon, C/o Khivraj Tech Park Pvt. Ltd. Chennai(1,00,000Sq.ft.) | IT - Interior fitouts | Dec-2005 | Jan-2006 | |
| 65 | IT Office including commissioning of Switch Boards, DBs, lighting,UPS/Raw Power Circuits, raceways, Cabling, Earthing, Water sprinkler, Fire Alarm & P.A. Systems. | Amazon Software Development Centre (India) Pvt. Ltd., Old Mahabalipuram Road, Chennai. (10,000 Sq.Ft) | IT - Interior fitouts | Oct-2005 | Feb-2006 | |
| 66 | 2 x 2000 KVA + 2500KVA transformers, 4 X 1500KVA DG sets, HT/LT Cables, sandwich type Rising mains and bus ducts, Cable trays, Earthing etc (Phase I) | Khivraj Tech Park Pvt. Ltd., Chennai (8,00,000 Sq.Ft.) | IT - infrastructure | Aug-2005 | Mar-2006 | |
| 67 | \HV/MV installation including transformers, generators, LT switch boards, cabling, earthing etc. | Fairmont Hotels, Bangalore(2,40,000 Sq.Ft.) | 5 Star Hotel - Infrastructure and Interior fitouts | Jun-2005 | Feb-2006 | |
| 68 | Turnkey electrification of 13 Floor, 3 Star hotel for Deccan Park Plaza Hotel comprising of 2 Nos. 630KVA Transformer, 2 Nos. 500 KVA DG Sets, complete HV/MV/LV installation for public and service area, banquet, restaurant,bar,100 Guest Rooms | M/s. Deccan Park Hotel (210000 Sq.Ft.) | 5 Star Hotels - Infrastructure & Interior fitouts | Aug-2004 | Jan-2005 | |
| 69 | 2 Nos. 500 KVA (11 KV) Transformers, 2 Nos. 500 KVA DG sets, fully automatic LT panel with electrical interlocking AMF panels, cabling, wiring and LV systems for telephones, computer and CCTV system. | Taj Malabar Hotel - Phases 1 & 2 | 5 Star Hotels - Infrastructure & Interior fitouts | 2002.0 | 2004.0 | |
| 70 | IT Office in 8th Floor for 180 computer stations with related UPS electrical lighting and power wiring including public address system, fire fighting, data and voice networking works. | HCL Comnet Ltd (16,000 Sq.Ft.) | IT - Interior fitouts | 2004.0 | 2004.0 | |
| 71 | Turnkey HT and LT installation of American School at Taramani comprising of 1 No. 1250 KVA 11 KV/433V Transformer & 3 Nos. Generators of ratings 750, 500 and 250 KVA all electrically interlocked and other downstream / related works. | American International School, Chennai (2,50,000 Sq.ft.) | International School - Infrastructure & Interior fitouts | 2002.0 | 2003.0 | |
| 72 | Five Star Hotel with substation, DG sets, Boiler Plant, Chillers, Cooling Towers,Laundry,Kitchen,PA System, Restaurant,Business Centre,Banquet 2nos. 630 KVA, 11KV OLTC transformers with remote tap changer cubicle (RTCC) ; 2nos. 750KVA DG Sets with AMF Panels for automatic Changeover.; 2nos. 1250A indoor busducts with flexibles Fully automated MV Panel with Electrical Interlocking for Automatic Changeover from EB to DG Complete LT Distribution, including all LT panels,cables & distribution boards Earthing works as per IS-3043, lightning arresters, indoor & outdoor lighting for Restaurants, Meeting Rooms,Lobby Swimming Pool, Guest Rooms, Kitchen, Laundry,Plant Room and Landscape areas | Trident Hilton, Chennai | 5 Star Hotels - Infrastructure & Interior fitouts | 2005.0 | 2005.0 | |