Methodology & Quality Control

(Scroll sideways to view full table)

S.No.

Equipment / Product

Process

Procedure

1

Transformers

Technical Specification

Confirmity on Technical Specification

 

 

 

Dimension Check

 

 

 

Load Losses

 

 

 

No Load Losses

 

 

 

Impedance

 

 

 

HV / LV Flanges

 

 

 

Accessories

 

 

 

Allied Gear including OLTC

   

Procurement

Shop Drawing approval

     

Detailed Engineering drawing approval

     

Wiring diagram approvals

     

Compliance with Delivery Schedules

     

Compliance with Warranty

   

Inspection at Works

Testing

     

Dimension Checks

     

Evaluation of Losses

     

Evaluation of Impedance

   

Commissioning

Verification with approved drawings

     

Confirmation on Inspection comments being complied

     

Pre‐commissioning tests

     

Function Tests

     

Ratio Tests

     

IR Tests

     

Oil Tests, if applicable

2

Cabling

Technical Specification

Confirmity on Technical Specification

   

Procurement

Preparation of cable schedule based on shop drawings

     

Evaluating length of Cable per drum based on cable schedule

   

Laying

Cable Tray system evaluation for adequate support to cables

     

Ensure all bends are smooth in cable trays

     

After each cable cut, Insulation Resistance Values to be taken

     

After each cable laid, Insulation Resistance Values to be taken

     

Update cable schedule

   

Termination

Double compression gland if outdoor

     

Check for tightness

   

Commissioning

Pre‐commissioning tests

3

HT / LT Panels

Technical Specification

Confirmity on Technical Specification

     

Location adequacy to be finalised

     

Clearances around panels to be checked

     

GA drawings and wiring diagrams prepared and checked

     

Shop drawing approvals

   

Procurement

Order based on Shop drawing approval

   

Inspection at Works

Visual check

     

Dimensional check

     

Function check

     

IR Values

     

High Voltage Test

     

IR Values

     

Checking of wiring including interlocking sequences, synchronising sequences, PLC function, SCADA function etc.

   

Commissioning

Verification with approved drawings

     

Confirmation on Inspection comments being complied

     

Function Check

     

Checking of wiring

4

DG Sets

Technical Specification

Confirmity on Technical Specification

     

Location adequacy to be finalised

     

Clearances around DG Set to be checked

     

GA drawings and wiring diagrams prepared and checked

     

Shop drawing approvals

   

Procurement

Order based on Shop drawing approval

   

Inspection at Works

Visual check

     

Dimensional check

     

Function check

     

Load Tests

     

Checking of wiring including interlocking sequences,
synchronising sequences, PLC function, SCADA function etc.

   

Commissioning

Verification with approved drawings

     

Confirmation on Inspection comments being complied

     

Function Check

     

Checking of wiring

     

Checking of exhaust, Fuel piping

5

Light Fixtures

Technical Specification

Confirmity on Technical Specification

     

Shop drawing approvals

   

Procurement

Order based on Shop drawing approval

   

Inspection at Site

Visual check

     

Checking of Ballasts, Control Gear, Connections etc

   

Commissioning

Earth Connection Checks

     

Phase and Neutral connection checks

     

Checks for earth leakage

6

Statutory

Drawings

Compliance with CEIG Norms

     

Adequate clearances

     

Compliance with NBC and NEC Norms

     

Compliance with KSEB Norms

   

Load Sanction

Location of metering point

     

Documentation adequacy

     

CEIG approval

     

Statutory Fee Remittance

     

Obtaining allied clearances